Type : Bid Notification
this project, shown on the Drawings entitled, “District Wide Flush Bathrooms at Waterfall Glen and Wood Dale Grove Forest Preserves,” prepared by the Forest Preserve District of DuPage County dated May 27, 2022, cons ......
this project, shown on the Drawings entitled, “District Wide Flush Bathrooms at Waterfall Glen and Wood Dale Grove Forest Preserves,” prepared by the Forest Preserve District of DuPage County dated May 27, 2022, cons ......
Refer to Root Engingeering Services project manual and drawings attached to Owner's Website as they relate to the Water Tank, Hydronic Pump and VAV Box Upgrades at Independence Grove In accordance with the Prevailing Wage Act, 820 ILCS 130/0.01 et seq., not less than the prevailing rate of wages for similar work in the locality in which the Work is to be performed shall be paid to all laborers, workers, and mechanics performing Work under this
Header InformationBid Number: S-62900-00010027 Description: 2024-2025 Forest Grove Tree Planting Bid Opening Date: 04/30/2024 03:00:00 PM Purchaser: Burke MAYER Organization: Department of Forestry Department: 629PROC - Procurement Only Location: PROC - Salem Procurement Fiscal Year: 25 Type Code: Allow Electronic Quote: No Alternate Id: Required Date: Available Date : 04/05/2024 02:05:46 PMInfo Contact: Bid Type: OPEN Informal Bid Flag: No Purchase
A Voluntary Pre-Bid Tour of the Units will be on November 12, 2020, at 8:30 AM starting at the Forest Grove District Office, 801 Gales Creek Road Forest Grove, OR. 97116.
Calaveras Big Trees State Parks: South Grove Forest Fuel Hazard Reduction and Restoration Project. The DVBE Participation has been waived for this Solicitation however the DVBE Incentive still applies.
Ryerson Woods, and Independence Grove Forest Preserves. The scope of work for this project shall include all labor and equipment to complete watering treatments of trees and shrubs at the above sites. Depending on rainfall during the 2024 growing season, reforestation sites (Work Sites) may require watering as many as seven times. The specific timing of watering shall be determined by Owner Project Manager based on soil conditions at the site.
Ryerson Woods, and Independence Grove Forest Preserves. The scope of work for this project shall include all labor and equipment to complete watering treatments of trees and shrubs at the above sites. Depending on rainfall during the 2024 growing season, reforestation sites (Work Sites) may require watering as many as seven times. The specific timing of watering shall be determined by Owner Project Manager based on soil conditions at the site.