Search results for: insulation installation

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 37
  • CONTRACTOR MUST PROVIDE BOILER FLUE PIPE <b>INSULATION</b> <b>INSTALLATION</b> AT THE NAVY HILL COMPLEX, SOUTH BUILDING LOCATED, 2423 E ST., NW., WASHINGTON, DC.

    CONTRACTOR MUST PROVIDE BOILER FLUE PIPE INSULATION INSTALLATION AT THE NAVY HILL COMPLEX, SOUTH BUILDING LOCATED, 2423 E ST., NW., WASHINGTON, DC...

    Type : Contract

    Due : 27 May, 2024 (in 28 days)
    Posted : 1 month ago
    Started : 22 Mar, 2024 (1 month ago)

    CONTRACTOR MUST PROVIDE BOILER FLUE PIPE INSULATION INSTALLATION AT THE NAVY HILL COMPLEX, SOUTH BUILDING LOCATED, 2423 E ST., NW., WASHINGTON, DC. Solicitation ID/Procurement Identifier: 47PD0322A0003 Ultimate Completion Date: Mon May 27 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Drywall and <b>Insulation</b> <b>Installation</b>

    Drywall and Insulation Installation

    Type : Contract

    Due : 07 Mar, 2024 (1 month ago)
    Posted : 1 month ago
    Started : 01 Mar, 2024 (1 month ago)

    \nCity, State: | Windham, Maine\nBrief Description of\nGoods/Services/Grant:\n\nPART II: JUSTIFICATION FOR VENDOR SELECTION\n\nDrywall and Insulation Installation\n\nCheck the box below for the justification(s) that applies to this request. (Check all that apply.)\n[1 A. Competitive Process DI G. Grant\n\n[1 B. Amendment DJ H. State Statute/Agency Directed\n[1 C. Single Source/Unique Vendor DJ Il. Federal Agency Directed\n\nDI D.

    From: Maine (State)

  • Fort Worth Structural and Parking

    Type : Bid Notification

    Due : 24 Apr, 2024 (4 days ago)
    Posted : 1 month ago
    Started : 20 Mar, 2024 (1 month ago)

    Of Insulation And Asbestos Installation And Removal

    From: Texas (State)

  • Building 92 and 66 renovation in Dubois, ID

    Type : Bid Notification

    Due : 13 May, 2024 (in 14 days)
    Posted : 1 month ago
    Started : 11 Apr, 2024 (17 days ago)

    Work will also removal and installation of new metal roofing with insulation, the removal and installation exteriormetal siding with new insulation. Reconfigured interior space will include 3 new workrooms, a chem lab, new electrical serviceand distribution, IT, Led lighting, access control, new HVAC, new plumbing, and new septic system.Site Visit:An organized site visit has been scheduled for:1.. Date: April 17, 20242.

    From: Federal Government (Federal)

  • Howell Science Building South Comprehensive Renovation (phase 1)

    Type : Bid Notification

    Due : 09 May, 2024 (in 10 days)
    Posted : 12 days ago
    Started : 16 Apr, 2024 (12 days ago)

    Joints, Joint Sealants BP 07B Roofing, Wall and Soffit Panels, Sheet Metal Flashing BP 07C Spray Applied Insulation BP 08A Doors, Frames, Hardware & Installation BP 08B Aluminum Entrances, Mirrors, Glazing, Curtainwall BP 09A Terrazzo Flooring BP 09B Drywall, Metal Stud Framing, Plastering, Thermal Insulation BP 09C Ceramic Tiling BP 09D Acoustical Panel Ceilings BP 09E Resinous Flooring & Concrete Sealing BP 09F Flooring BP 09G Painting and Wall

    From: University of North Carolina (Higher Education)

  • Howell Science Building South Comprehensive Renovation (Phase 1)

    Type : Bid Notification

    Due : 09 May, 2024 (in 10 days)
    Posted : 9 days ago
    Started : 16 Apr, 2024 (12 days ago)

    Joints, Joint Sealants BP 07B Roofing, Wall and Soffit Panels, Sheet Metal Flashing BP 07C Spray Applied Insulation BP 08A Doors, Frames, Hardware & Installation BP 08B Aluminum Entrances, Mirrors, Glazing, Curtainwall BP 09A Terrazzo Flooring BP 09B Drywall, Metal Stud Framing, Plastering, Thermal Insulation BP 09C Ceramic Tiling BP 09D Acoustical Panel Ceilings BP 09E Resinous Flooring & Concrete Sealing BP 09F Flooring BP 09G Painting and Wall

    From: University of North Carolina (Higher Education)

  • T-Hanger at the Greene County Airfield

    Type : Bid Notification

    Due : 17 May, 2024 (in 18 days)
    Posted : 24 days ago
    Started : 04 Apr, 2024 (24 days ago)

    Before payment, every part of the construction will be examined.This project will include:Light grading, Hauling, Erosion Control Measures, Concrete Slab Installation, Steel Erection, Fire Wall Installations, Large Hanger Door Installations, Walk-in Door Installations, Insulation, Sky Lights, and Electrical Installation.Any soil required for sub-grade work is to be obtained at the contractor’s expense.

    From: Greene (County)