Type : Bid Notification
42 ABW/HC requires furniture reupholster and replacement on Maxwell AFB, AL. Grace Chapel, Building 3, is in need of the sanctuary seating to be reupholstered. Additionally, the altar drapes at Grace Chapel and Faith Chapel Building 155 are in need of replacement. In accordance with the attached Statement of Work (SOW).