Type : Bid Notification
Design Build Services for Metal Building at Water Pollution Control Facility 031224 Open April 4, 2024 9:00 AM May 1, 2024 2:00 PM
Design Build Services for Metal Building at Water Pollution Control Facility 031224 Open April 4, 2024 9:00 AM May 1, 2024 2:00 PM
RFP - Metal Building - Duffield 4-8-24.pdf(782.91 KB)RFP - Metal Insulated Building4/8/24RFx Document Follow B2B Activity Unfollow B2B Activity Add B2B Posting There are no B2B messages to display There are no Questionnaires to display There are no Questionnaires to display There are no Questionnaires to display There are no Questionnaires to display Grid 1 - Response I1_1.
The Federal Law Enforcement Training Center, Glynco, Georgia has a requirement for Metal Building for FLTEC Satellite Accumulation Center: See attached solicitation for complete item description of metal building.Building requirement include:Building shall be a pre-engineered clear span mono-slope metal building that shall be Miami-Dade County Approved.Building dimensions are 100 feet long x 80 ft. Wide x 20 ft. high at eave.
Distribution Notes None Scope of Work Provide two metal building kits for the City of Independence, MO.
NAICS code: 332311 Small business size standard: 500 employees. 60' X 85" Metal Building Please respond to this RFQ by emailing response to: Synthya L. Barbee at E-mail: synthya.barbee@us.af.mil no later than 3:00pm CST, 14 September 2018 (or sooner if possible) in order to be considered timely.
Description: Construct a metal building that is already purchased. Publication Date/Time: 2/16/2019 8:00 AM Publication Information: 2/16/19; NPG Closing Date/Time: 3/11/2019 10:00 AM Submittal Information: Before 10:00 a.m. on 3/11/19; Commissioner's Office Bid Opening Information: 03/11/19; 10:00 a.m. Contact Person: Kim Hartman, CPPB Purchasing Agent Buchanan County Courthouse 411 Jules Street, Room 101 St.
The Federal Law Enforcement Training Centers, Glynco Georgia has a requirement for a Metal Building :Structure shall be a pre-engineered clear span metal building.Building dimensions are 100 feet (ft.) long x 120 ft. wide x 20 high ft. eave. These are minimum dimensions.Maximum roof pitch of 2:12.Four personnel doors shall be included in the design and manufacture. Locate on each side or as determined by the government.