Type : Bid Notification
This work is part of the required mitigation plan for the Savannah Harbor Expansion Project (SHEP). The marsh restoration includes excavation and grading of a designated area on Onslow Island (Northing: 782,928.2516; Easting: 974,087.2680), within the Savannah River at the confluence of the Front River and Middle River and is within the boundaries of the Savannah National Wildlife Refuge.