Search results for: construction of microgrid

Showing opportunity 1 - 10 of 10
  • Installation of Photovoltaic Microgrid with Battery Storage- Juana Diaz, Puerto Rico

    Type : Pre-Bid Notification

    Due : 30 Sep, 2024 (in 5 months)
    Posted : 3 months ago
    Started : 16 Jan, 2024 (3 months ago)

    DESCRIPTION: The proposed project is a design/bid/build project is for the construction a new microgrid system capable of islanding the Juana Diaz (LTC Hernan G.Pasquera ARC, PR010) electrical distribution system starting at the automated distribution switch, the point of common coupling with Puerto Rico Electric Power Authority (PREPA).

    From: Federal Government (Federal)

  • Ft. Buchanan Microgrid

    Type : Bid Notification

    Due : 07 May, 2024 (in 3 days)
    Posted : 9 days ago
    Started : 23 Apr, 2024 (10 days ago)

    Project Location: Ft Buchanan, San Juan, PR Project Description: Design-Bid-Build Construction project to provide an installation-level microgrid at Fort Buchanan consisting of approximately 8 MW diesel generators and 4 MWh battery energy storage system (BESS).

    From: Federal Government (Federal)

  • LTC Hernan G. Pesquera ARC Microgrid in Juana Diaz, Puerto Rico

    Type : Bid Notification

    Due : 06 May, 2024 (in 2 days)
    Posted : 1 month ago
    Started : 19 Apr, 2024 (14 days ago)

    Pesquera ARC Microgrid in Juana Diaz, Puerto Rico.Estimated Construction Cost is between $10,000,000 and $25,000,000 per DFARS 236.204.NAICS Code: 237130, Power and Communication Line and Related Structures Construction, which has a size standard of $45,000,000.Please note that business size in the System for Award Management (SAM) is determined by the NAICS code.

    From: Federal Government (Federal)

  • RFI 24-037 Calgary Transit Garage Integrated Microgrid System

    Type : Bid Notification

    Due : 27 May, 2024 (in 23 days)
    Posted : 3 days ago
    Started : 29 Apr, 2024 (4 days ago)

    The City of Calgary (The City) is seeking information and details from organizations on available options that can provide an electrical power management microgrid solution for Calgary Transit (CT). Respondents are encouraged to present as many ideas as available, so long as they meet or exceed the key requirements detailed in 2.3.

    From: Canada (Federal)

  • Ramey Army Reserve Center (ARC) Microgrid Construction-Aguadilla, Puerto Rico

    Type : Pre-Bid Notification

    Due : N/A
    Posted : 1 month ago
    Started : 04 Mar, 2024 (2 months ago)

    DESCRIPTION: The proposed project is a design/bid/build project for the construction of a new microgrid system capable of islanding the Ramey Army Reserve Center (ARC) electrical distribution system starting at the automated distribution switch, the point of common coupling with Puerto Rico Electric Power Authority (PREPA).

    From: Federal Government (Federal)

  • Technical Assistance Funding to Develop Grid Modernization Projects

    Type : Bid Notification

    Due : 01 Dec, 2027 (in about 3 years)
    Posted : 27 days ago
    Started : 21 Mar, 2024 (1 month ago)

    of DERs for enhancing system adaptive capacity during disruptive events, including microgrids and battery-storage subcomponentsWeatherization technologies and equipment The funding will be available on a first-come, first-served basis until funds have been exhausted with a one-time maximum award of up to $200,000 per applicant.

    From: New York State (State)

  • Technical Assistance Funding to Develop Grid Modernization Projects

    Type : Bid Notification

    Due : N/A
    Posted : 26 days ago
    Started : 23 Mar, 2024 (1 month ago)

    of DERs for enhancing system adaptive capacity during disruptive events, including microgrids and battery-storage subcomponentsWeatherization technologies and equipment The funding will be available on a first-come, first-served basis until funds have been exhausted with a one-time maximum award of up to $200,000 per applicant.

    From: New York State (State)